Luca Intersects 19 Metres of 6.3 g/t Gold Equivalent from the Creston Vein at Tahuehueto Mine 

Luca Mining Corp. (“Luca” or the “Company”) (TSX-V: LUCA; OTCQX: LUCMF; Frankfurt: Z68) is pleased to report new assay results from its ongoing 2026 exploration drill program at the Tahuehueto gold-silver mine in Durango, Mexico. 

The latest results are highlighted by an intersection of 18.7 metres (“m”) of 6.28 g/t gold equivalent (“AuEq”**) at the Creston Vein, which returned a wider and higher-grade mineralized interval than previously anticipated in the resource model. Located close to existing underground infrastructure, the intersection is within an area scheduled for mining during the first half of 2027 and has the potential to provide additional high-grade mill feed in the near term. 

Additional high-grade results from the Catorce and Santiago veins continue to demonstrate the potential for near-mine resource expansion at Tahuehueto. At Catorce, an underexplored area interpreted to represent a southern extension of the Creston Vein system, drilling returned 13.7 m of 3.33 g/t AuEq and 3.6 m of 6.67 g/t AuEq. At Santiago, drilling intersected 11.6 m of 5.21 g/t AuEq as ongoing infill and step-out programs continue to define this growing mineralized system. 

Highlights 

  • High-grade intersection at the Creston Vein, exceeding expectations for both width and grade, in close proximity to existing underground infrastructure and areas scheduled for mining in H1 2027: 
  • TRT26-15: 18.7 m of 6.28 g/t AuEq (2.65 g/t Au, 75.08 g/t Ag, 0.86% Cu, 4.61% Pb and 11.16% Zn) from 30.4 m including 7.8 m of 7.14 g/t AuEq (2.85 g/t Au, 83.40 g/t Ag, 1.05% Cu, 5.26% Pb and 13.51% Zn) from 30.4 m and including 7.1 m of 8.55 g/t AuEq (3.76 g/t Au, 103.83 g/t Ag, 1.09% Cu, 6.29% Pb and 14.43% Zn) from 42.0 m 
  • TRT26-14: 1.9 m of 5.02 g/t AuEq (4.38 g/t Au, 24.72 g/t Ag, 0.24% Cu, 0.59% Pb and 0.79% Zn) from 52.4 m  
  • Continued high-grade results from first exploration drillholes at the Catorce Block since 2008: 
  • DDH26-RCE-05: 13.7 m of 3.33 g/t AuEq (2.21 g/t Au, 88.80 g/t Ag, 0.02% Cu, 0.48% Pb, 0.68% Zn) from 184.8 m including 0.7 m of 8.57 g/t AuEq (4.50 g/t Au, 373.00 g/t Ag, 0.01% Cu, 0.29% Pb, 0.37% Zn) from 184.8 m and 2.0 m of 4.99 g/t AuEq (3.49 g/t Au, 119.35 g/t Ag, 0.02% Cu, 0.69% Pb and 0.89% Zn) from 187.3 m  
  • The Catorce Block is located approximately 300 m from existing underground development and is interpreted to represent a southern extension of the Creston Vein within an area of structural complexity. Luca has completed seven diamond drillholes totalling 1,532 m as part of its renewed exploration program in this area. 
  • Continued high-grade intercepts from the Santiago vein: 
  • DDH26-SGO-12: 11.6 m of 5.21 g/t AuEq (4.72 g/t Au, 42.47 g/t Ag, 0.02% Cu, 0.04% Pb, 0.13% Zn) from 122.1 m including 1.2 m of 9.90 g/t AuEq (9.60 g/t Au, 26.00 g/t Ag, 0.01% Cu, 0.03% Pb and 0.08% Zn) from 128.0 m 
  • DDH26-SGO-11: 8.8 m of 3.09 g/t AuEq (2.61 g/t Au, 21.38 g/t Ag, 0.25% Cu, 0.21% Pb, 0.21% Zn) from 170.9 m including 3.1 m of 3.53 g/t AuEq (2.87 g/t Au, 24.26 g/t Ag, 0.45% Cu, 0.16% Pb and 0.16% Zn) from 176.7 m 
  • DDH26-SGO-10: 1.3 m of 3.58 g/t AuEq (3.05 g/t Au, 25.50 g/t Ag, 0.10% Cu, 0.86% Pb, 0.54% Zn) from 161.9 m and an interval of 1.7 m of 5.40 g/t AuEq (4.72 g/t Au, 52.33 g/t Ag, 0.09% Cu, 0.25% Pb, 0.13% Zn) from 172.1 m  
  • Exploration continues across multiple targets at Tahuehueto, with two contracted diamond drill rigs currently on site, an additional surface rig en route and Luca’s underground Termite rig supporting near-term mineral definition. To date, the Company has completed 67 underground drillholes totalling 11,450 m and 38 surface drillholes totalling 7,236 m. 

“These results continue to support our view that mineralization at Tahuehueto is continuous and that the broader system remains underexplored, with significant potential for further resource growth,” stated Paul D. Gray, Vice President Exploration of Luca Mining. “The standout result of 18.7 metres at 6.28 g/t AuEq from the Creston Vein exceeded our previous interpretation of the zone in both width and grade. Importantly, this mineralization is located close to existing underground development, and we anticipate being able to bring this area into production in 2027, with the potential to improve mill head grades and mining efficiency given the width of the mineralized interval. 

We are also encouraged by the continued high-grade results from Catorce and Santiago, which highlight the exploration potential across multiple vein systems at Tahuehueto. Looking ahead, our program will focus on continued definition drilling at Creston, Perdido, Catorce and Santiago, as well as testing the highly prospective gap between the Creston and Santiago vein systems. We believe these efforts can both support near-term mine planning and unlock additional resource growth across the property.” 

Drill Results Summary 

Drillholes DDH26-RCE-02 through DDG26-RCE-07 targeted mineralization previously identified within the Catorce Block, a known, but under-drilled Tahuehueto mineralized zone that is interpreted to be a southern extension of the Creston Vein System and has not seen any exploration efforts since 2008 (see Company News Release dated September 8, 2026). 

Drillholes DDH26-SGO-10 through DDH26-SGO-12 targeted mineralization within the Santiago Vein through in-fill drilling bolstering 2025 drilling success in the zone (See Company News Releases dated September 8, 2025 and December 19, 2025).  

To date, Luca has completed 67 underground holes for 11,450 m and 38 surface holes for 7,236 m using “HQ”, “NQ” and/or “BQ” sized diamond drill core (Creston, Perdido, El Rey, Catorce and Santiago targets). 

Key Intercepts  

Catorce: 

DDH26-RCE-05 

  • 13.7 metres (“m”) of 3.33 g/t AuEq** (2.21 g/t Au, 88.80 g/t Ag, 0.02% Cu, 0.48% Pb, 0.68% Zn) from 184.8 m including 0.7 m of 8.57 g/t AuEq (4.50 g/t Au, 373.00 g/t Ag, 0.01% Cu, 0.29% Pb, 0.37% Zn) from 184.8 m and 2.0 m of 4.99 g/t AuEq (3.49 g/t Au, 119.35 g/t Ag, 0.02% Cu, 0.69% Pb and 0.89% Zn) from 187.3 m  

DDH26-RCE-02 

  • 3.6 m of 6.67 g/t AuEq (4.84 g/t Au, 98.29 g/t Ag, 0.17% Cu, 1.30% Pb, 3.49% Zn) from 195.0 m including 0.7 m of 14.86 g/t AuEq (11.20 g/t Au, 93.70 g/t Ag, 0.53% Cu, 3.68% Pb, 12.76% Zn) from 197.9 m and additional intersection of 1.3 m of 3.81 g/t AuEq (2.23 g/t Au, 17.01 g/t Ag, 0.16% Cu, 0.99% Pb, 8.29% Zn) from 205.3 m 

DDH26-RCE-06 

  • 3.5 m of 4.19 g/t AuEq (1.41 g/t Au, 250.59 g/t Ag, 0.01% Cu, 0.53% Pb, 0.20% Zn) from 168.8 m including 0.8 m of 12.91 g/t AuEq (4.17 g/t Au, 813.00 g/t Ag, 0.01% Cu, 0.15% Pb, 0.37% Zn) from 170.5 m  

Santiago: 

DDH26-SGO-12 

  • 11.6 m of 5.21 g/t AuEq (4.72 g/t Au, 42.47 g/t Ag, 0.02% Cu, 0.04% Pb, 0.13% Zn) from 122.1 m including 1.6 m of 8.05 g/t AuEq (7.10 g/t Au, 86.23 g/t Ag, 0.02% Cu, 0.04% Pb, 0.08% Zn) from 122.1 m and 1.2 m of 8.40 g/t AuEq (7.90 g/t Au, 43.52 g/t Ag, 0.02% Cu, 0.02% Pb and 0.11% Zn) from 126.1 m and including 1.2 m of 9.90 g/t AuEq (9.60 g/t Au, 26.00 g/t Ag, 0.01% Cu, 0.03% Pb and 0.08% Zn) from 128.0 m 

DDH26-SGO-11 

  • 8.8 m of 3.09 g/t AuEq (2.61 g/t Au, 21.38 g/t Ag, 0.25% Cu, 0.21% Pb, 0.21% Zn) from 170.9 m including 4.7 m of 3.47 g/t AuEq (3.03 g/t Au, 23.22 g/t Ag, 0.16% Cu, 0.27% Pb, 0.25% Zn) from 170.9 m and including 3.1 m of 3.53 g/t AuEq (2.87 g/t Au, 24.26 g/t Ag, 0.45% Cu, 0.16% Pb and 0.16% Zn) from 176.7 m 

DDH26-SGO-10 

  • 1.3 m of g/t 3.58 AuEq (3.05 g/t Au, 25.50 g/t Ag, 0.10% Cu, 0.86% Pb, 0.54% Zn) from 161.9 m and an interval of 1.7 m of 5.40 g/t AuEq (4.72 g/t Au, 52.33 g/t Ag, 0.09% Cu, 0.25% Pb, 0.13% Zn) from 172.1 m  

Production Verification Drillholes 

As part of the Tahuehueto exploration program a Luca owned and operated Termite drill rig capable of drilling “BQ” sized drill core up to 100 m in length has been added to bolster near underground workings verification and mineral definition.  Drill core from this drill rig are handled by the Tahuehueto exploration department and treated the same as exploration drill core (processing, logging and sampling) and is now being utilized to more accurately define the mineralized zones anticipated to be part of the near-term mine plan objectives.  Drillholes TRT26-09 through TRT26-11 were drilled from Level 12 of the Tahuehueto mine and targeted the Perdido vein in areas that are scheduled to be mined during H1 2027.  Drillholes TRT26-12 through TRT26-15 were drilled from Level 25 and targeted the Creston Vein in areas that are scheduled to be mined during H1 2027. 

Of particular significance, drillhole TRT26-15 intersected a wider and higher-grade interval than previously anticipated within the Creston Vein, providing additional geological information that may support the inclusion of high-grade material in the Company’s 2027 mine plan. 

TRT26-15 

  • 18.7 m of 6.28 g/t AuEq (2.65 g/t Au, 75.08 g/t Ag, 0.86% Cu, 4.61% Pb and 11.16% Zn) from 30.4 m including 7.8 m of 7.14 g/t AuEq (2.85 g/t Au, 83.40 g/t Ag, 1.05% Cu, 5.26% Pb and 13.51% Zn) from 30.4 m and including 7.1 m of 8.55 g/t AuEq (3.76 g/t Au, 103.83 g/t Ag, 1.09% Cu, 6.29% Pb and 14.43% Zn) from 42.0 m 

TRT26-14 

  • 1.9 m of 5.02 g/t AuEq (4.38 g/t Au, 24.72 g/t Ag, 0.24% Cu, 0.59% Pb and 0.79% Zn) from 52.4 m  

True widths are estimated to be approximately 85-90% of drilled intervals. 

Figures 1-9 present the location of the drillholes with assay results and Tables 1 and 2 provide summary analytical results and drill collar details, respectively. 

Figure 1 

Figure 2 

Figure 3 

Figure 4 

Figure 5 

Figure 6 

Figure 7 

Figure 8 

Figure 9 

About 2026 Tahuehueto Exploration Program 

The Tahuehueto property comprises a large epithermal gold-silver vein system with approximately 11 kilometres of known vein strike length and numerous mineralized structures. Mineralization remains open along strike and at depth across most modeled Mineral Resource areas. The current campaigns represent the first substantive exploration drilling conducted on the property in more than 12 years, and the first since the addition of key concessions to the land package (See Company News Release dated August 28, 2025). 

Luca’s 2026 exploration program builds on the success of the 2025 campaign. The program is designed to expand known mineral resources, adding near-term mineable material and defining the vertical and lateral extent of mineralization, as well as to identify additional thick, high-grade breccia zones known to occur within the epithermal vein system, and test multiple underexplored vein systems. 

In addition to the four veins that currently support the mineral resource, at least 14 additional prospective veins have been documented within the concession area with potential to host epithermal Au-Ag (±Cu-Zn-Pb) mineralization. In several cases, these targets may represent extensions of the existing mineralized structures. 

Overall, the Company has identified more than 11 km of prospective vein structures along strike, compared to approximately 4.5 km of mineralized veins incorporated into the current mineral resource model, highlighting significant exploration upside across the property. 

Assay Tables and Collar Locations 

Table 1: Highlighted Diamond Drill Assay Results from TRT26-09 through THT26-15, DDH26-SGO-10 through DDH26-SGO-12, and DDH26-RCE-02 through DDH26-RCE-07. 

Hole From (m) To (m) Interval* (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) AuEq** (g/t) 
TRT26-09 No Significant Mineralization 
TRT26-10 No Significant Mineralization 
TRT26-11 29.8 32.5 2.7 0.24 33.45 0.09 1.32 3.15 1.27 
TRT26-12 41.3 42.9 1.6 0.85 38.31 0.57 1.15 5.46 2.61 
TRT26-13 53.1 56.1 3.0 1.41 4.97 0.04 0.09 0.13 1.52 
TRT26-14 26.4 27.3 0.9 2.42 10.70 0.09 0.08 0.22 2.65 
41.7 45.6 3.8 1.31 21.56 0.20 1.01 1.17 1.99 
52.4 54.2 1.9 4.38 24.72 0.24 0.59 0.79 5.02 
TRT26-15 30.4 49.1 18.7 2.65 75.08 0.86 4.61 11.16 6.28 
Including                 
30.4 38.1 7.8 2.85 83.40 1.05 5.26 13.51 7.14 
42.0 49.1 7.1 3.76 103.83 1.09 6.29 14.43 8.55 
And                 
49.7 50.3 0.6 2.15 20.30 0.11 0.96 1.41 2.77 
DDH26-SGO-10 161.9 169.8 7.9 1.69 14.43 0.05 0.35 0.33 1.98 
Including                 
161.9 163.2 1.3 3.05 25.50 0.10 0.86 0.54 3.58 
164.2 165.3 1.2 2.51 13.90 0.08 0.18 0.27 2.78 
And                 
172.1 173.7 1.7 4.72 52.33 0.09 0.25 0.13 5.40 
DDH26-SGO-11 61.5 64.6 3.1 0.10 75.70 0.11 2.13 1.02 1.41 
115.5 116.0 0.5 1.36 7.90 0.06 0.13 0.21 1.54 
And                 
170.9 179.8 8.8 2.61 21.38 0.25 0.21 0.21 3.09 
including                 
170.9 175.6 4.7 3.03 23.22 0.16 0.27 0.25 3.47 
176.7 179.8 3.1 2.87 24.26 0.45 0.16 0.16 3.53 
DDH26-SGO-12 114.0 115.7 1.7 8.19 80.35 0.19 0.41 0.53 9.33 
122.1 133.7 11.6 4.72 42.47 0.02 0.04 0.13 5.21 
including                 
122.1 123.7 1.6 7.10 86.23 0.02 0.04 0.08 8.05 
126.1 127.4 1.2 7.90 43.52 0.02 0.02 0.11 8.40 
128.0 129.2 1.2 9.60 26.00 0.01 0.03 0.08 9.90 
DDH26-RCE-02 183.6 206.6 23.0 1.32 32.91 0.12 0.82 1.70 2.10 
Including                 
186.3 189.1 2.8 0.77 25.87 0.06 1.66 2.14 1.60 
195.0 198.6 3.6 4.84 98.29 0.17 1.30 3.49 6.67 
  Including               
197.9 198.6 0.7 11.20 93.70 0.53 3.68 12.76 14.86 
And                 
205.3 206.6 1.3 2.23 17.01 0.16 0.99 8.29 3.81 
         DDH26-RCE-03 158.2 160.6 2.4 0.31 86.17 0.01 0.22 0.02 1.26 
DDH26-RCE-04 No Significant Mineralization 
DDH26-RCE-05 184.8 198.5 13.7 2.21 88.80 0.02 0.48 0.68 3.33 
  Including               
184.8 185.4 0.7 4.50 373.00 0.01 0.29 0.37 8.57 
And                 
187.3 189.3 2.0 3.49 119.35 0.02 0.69 0.89 4.99 
DDH26-RCE-06 168.8 172.3 3.5 1.41 250.59 0.01 0.53 0.20 4.19 
Including                 
170.5 171.3 0.8 4.17 813.00 0.01 0.15 0.37 12.91 
And                 
184.0 187.8 3.8 0.64 29.55 0.04 1.73 9.46 2.51 
DDH26-RCE-07 No Significant Mineralization 

*True widths are estimated to be approximately 85-90% of drilled intervals. 

**AuEq equation is: AuEq = Au + (Ag*0.0107) + (Cu%*0.8073) + (Pb%*0.1323) + (Zn%*0.1370), considering actual reported metallurgical recoveries of Au 84%, Ag 85%, Cu 78.3%, Pb 71.6% and Zn 48%, at $3,800 US$/oz Au, 40 US$/oz Ag,10,582 US$/Tonne Cu, 1,896 US$/Tonne Pb and 2,930 US$/Tonne Zn. 

Table 2: Drill Collar Locations and Details for Released Results 

Hole ID UTM WGS84 Z14 Elevation (m) Azimuth Dip Final Depth (m) 
Easting Northing 
TRT26-09 337777 2813025 1,509.80 150 -6 50.0 
TRT26-10 337791 2813018 1,512.53 147 -25 42.0 
TRT26-11 337792 2813018 1,512.58 131 -16 40.0 
TRT26-12 337424 2812589 1,212.74 300 20 43.8 
TRT26-13 337424 2812589 1,212.74 307 -15 76.5 
TRT26-14 337424 2812589 1,212.74 318 -15 71.5 
TRT26-15 337424 2812589 1,212.74 322 14 88.5 
DDH26-SGO-10 338645 2813491 1,813.53 294 -53 201.0 
DDH26-SGO-11 338645 2813491 1,813.53 298 -58 216.0 
DDH26-SGO-12 338645 2813491 1,813.52 294 -40 163.5 
DDH26-RCE-02 337099 2812432 1,318.00 265 -65 225.0 
DDH26-RCE-03 337099 2812432 1,318.00 283 -56 195.0 
DDH26-RCE-04 337099 2812432 1,318.00 303 -49 195.0 
DDH26-RCE-05 337099 2812432 1,318.00 281 -69 219.5 
DDH26-RCE-06 337099 2812432 1,318.40 280 -62 204.0 
DDH26-RCE-07 337099 2812432 1,318.00 303 -66 211.5 

About Luca Mining Corp.  

Luca Mining (TSX-V: LUCA, OTCQX: LUCMF, Frankfurt: Z68) is a diversified Canadian mining company with two 100%-owned producing mines within the prolific Sierra Madre mineralized belt in Mexico which hosts numerous producing and historical mines along its trend. The Company produces gold, copper, zinc, silver and lead from these mines that each have considerable development and resource upside. 

The Campo Morado polymetallic VMS mine is an underground operation located in Guerrero State within a 121 square kilometer land package.  It produces copper-zinc-lead concentrates with precious metals credits. It is currently undergoing an optimization program which is already generating significant improvements in recoveries, grades, efficiencies, and cashflows. 

The Tahuehueto Mine is a large property of over 100 square kilometres in Durango State.  The project hosts epithermal gold and silver vein-style mineralization.  Tahuehueto is a newly constructed underground mining operation producing primarily gold and silver.  The Company has successfully commissioned its mill and is now in commercial production. 

Analytical Method and Quality Assurance/Quality Control Measures 

All drill core splits reported in this news release were analyzed by Bureau Veritas of Durango, Mexico, utilizing the Multi-Acid digestion ICP-ES 35-element MA300 analytical package with FA-430 30-gram Fire Assay with AAS finish for gold on all samples. Au over-limits from FA-430 are re-analyzed by FA530 30-gram Fire Assay with Gravimetric finish. Ag over-limits from ICP MA300 analytical package are re-analyzed by FA530 30-gram Fire Assay with Gravimetric finish. Similarly, Cu, Pb and Zn over-limits from ICP MA300 analytical package are re-analyzed by ICP Multi-Acid digestion MA370 package. All core samples were split by core saw on-site at Luca’s core processing facilities at the Tahuehueto Mine. Once split, half samples were placed back in the core boxes with the other half of split samples sealed in poly bags with one part of a three-part sample tag inserted within. Samples were collected by Bureau Veritas at the Tahuehueto Mine site and transported to Bureau Veritas’ Durango Laboratory, where samples are prepared to a 250-gram pulp and analyzed for Gold by Fire assay with pulps shipped to Bureau Veritas’s Analytical laboratory in Vancouver, B.C., for final ICP chemical analysis.  A robust system of standards, 1/4 core duplicates and blanks were implemented in the 2024-2026 exploration drilling program and is monitored as chemical assay data become available. 

Qualified Person 

The technical information contained in this news release has been reviewed and approved by Mr. Paul D. Gray, P.Geo., Vice President Exploration at Luca Mining.  Mr. Gray is a Qualified Person for the Company as defined by National Instrument 43-101. 

On Behalf of the Board of Directors 

(signed) “Dan Barnholden” 

Dan Barnholden, Chief Executive Officer 

 
Contact Information: 
Sophia Shane 
Director of Corporate Development 
sshane@lucamining.com  +1 604 306 6867 
Maximillian Myers 
Manager Corporate Development & Investor Relations 
mmyers@lucamining.com   

For more information, please visit: www.lucamining.com  

Cautionary Note Regarding Forward-Looking Statements 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, conditions or performance that are based on assumptions about the proposed exploration programs and its anticipated results; the timing and costs of future activities on the Company’s properties; success of exploration and development; anticipated time and results of forthcoming reports on the Tahuehueto mine; capital requirements; future production expectations and results thereof. In certain cases, Forward-Looking Information can be identified using words and phrases such as “plans”, expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the Company will be able to raise additional capital as necessary; the current exploration, development, environmental and other objectives concerning the Tahuehueto mine can be achieved; that consistent and sustainable mill feed at Tahuehueto mine will be achieved; the continuity of the price of gold and other metals and economic and political conditions. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

LUCA MINING COMPLETES C$211 MILLION SUBSCRIPTION RECEIPT FINANCINGS IN CONNECTION WITH THE PROPOSED ACQUISITION OF CAPSTONE COPPER’S COZAMIN MINE 

Luca Mining Corp. (“Luca” or the “Company”) (TSX-V: LUCA; OTCQX: LUCMF; Frankfurt: Z68) is pleased to announce that in connection with the proposed acquisition of the Cozamin Mine (the “Acquisition”) from Capstone Copper Corp. (“Capstone”) announced on September 21, 2026, the Company has completed a bought deal private placement offering of 155,000,000 subscription receipts (the “Subscription Receipts”) at a price of C$1.00 per Subscription Receipt (the “Issue Price”) for gross proceeds of C$155,000,000 (the “Offering”). The Offering was conducted by National Bank Financial Inc. (the “Lead Underwriter”), as lead underwriter and sole bookrunner, with Scotia Capital Inc. as co-lead manager, together with Raymond James Ltd., ATB Cormark Capital Markets, BMO Capital Markets, Canaccord Genuity Corp., Haywood Securities Inc. and Stifel Nicolaus Canada Inc. (collectively, the “Underwriters”). 

Concurrently with the closing of the Offering, the Company completed a non-brokered private placement with Wheaton Precious Metals Corp. (“Wheaton”) and Taurus Mining Finance Fund No. 3 (“Taurus”), pursuant to which Wheaton acquired 35,227,250 Subscription Receipts at the Issue Price and Taurus acquired 21,136,350 Subscription Receipts at the Issue Price, for aggregate gross proceeds of C$56,363,600 (the “Concurrent Private Placement”). The purchase of Subscription Receipts by Taurus is in addition to their committed US$75 million portion of the US$125 million senior secured acquisition facility, expected to close concurrently with the completion of the Acquisition. 

The Company intends to use the net proceeds from the Offering and the Concurrent Private Placement to fund, in part, the cash portion of the consideration payable in connection with the Acquisition. 

In connection with the Offering, Goldgroup Mining Inc. (“Goldgroup”) acquired 101,123,662 Subscription Receipts and entered into an investor rights agreement with the Company pursuant to which Goldgroup is entitled to certain rights, provided it maintains certain ownership thresholds in the Company, including: (a) the right to participate in equity financings and top-up its holdings in relation to dilutive issuances in order to maintain its pro rata ownership interest at the time of such financing; and (b) the right to nominate two persons to the board of directors of the Company. 

The gross proceeds from the Offering and the Concurrent Private Placement, less certain fees and expenses of the Underwriters (the “Escrowed Proceeds”) were placed into escrow with Computershare Trust Company of Canada (the “Subscription Receipt Agent”). Each Subscription Receipt represents the right of a holder to receive, upon satisfaction or waiver of certain release conditions (including the satisfaction of all conditions precedent to the completion of the Acquisition) (the “Escrow Release Conditions”), without payment of additional consideration, one common share in the capital of the Company (each a “Common Share” and collectively, the “Common Shares”) subject to adjustments and in accordance with the terms and conditions of a subscription receipt agreement entered into among the Company, the Lead Underwriter, and the Subscription Receipt Agent on the date hereof (the “Subscription Receipt Agreement”). Provided that the Escrow Release Conditions are satisfied or waived (where permitted) on or before 5:00 p.m. (Toronto time) on February 28, 2027, unless extended as described below or by the Company with the prior written consent of the Lead Underwriter (the “Escrow Release Deadline”), the Escrowed Proceeds, together with all interest earned thereon, will be released to the Company and the Underwriters in accordance with the terms of the Subscription Receipt Agreement. 

If the closing of the Acquisition has not occurred on or prior to the Escrow Release Deadline as a result of the failure to obtain the requisite regulatory approvals in connection with the Acquisition, then the initial Escrow Release Deadline may be extended by up to two additional successive periods of one month each (for a maximum aggregate extension of the initial Escrow Release Deadline by two months). 

If the Escrow Release Conditions are not satisfied prior to the Escrow Release Deadline, or an earlier termination event as set out in the Subscription Receipt Agreement occurs, the Escrowed Proceeds together with all interest earned thereon, will be returned on a pro rata basis to the holders of the Subscription Receipts, and the Subscription Receipts will be cancelled and have no further force and effect.  

The Subscription Receipt Agreement provides that purchasers in the Offering and the Concurrent Private Placement may also elect to waive the Escrow Release Conditions and convert their Subscription Receipts into Common Shares prior to the Escrow Release Deadline, provided that the number of Common Shares issuable upon conversion thereof does not exceed 19.9% of the issued and outstanding Common Shares on a non-diluted basis, unless the Company has obtained requisite shareholder and regulatory approvals. 

As consideration for their services in connection with the Offering, the Company agreed to pay the Underwriters a cash commission equal to 5.5% of the gross proceeds of the Offering, other than in respect of the Subscription Receipts acquired by Goldgroup on which a reduced commission of 1.0% is payable. 50% of the Underwriters’ commission in connection with the Offering was paid on closing of the Offering, with the remaining 50% to be held in escrow pending satisfaction of the Escrow Release Conditions.  

The Offering and Concurrent Private Placement remain subject to the final approval of the TSX Venture Exchange (“TSXV”). The Subscription Receipts, including the Common Shares issuable upon conversion thereof, are subject to a statutory hold period expiring on February 15, 2027. 

The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”), or any state securities laws, and accordingly, may not be offered or sold within the United States except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities laws requirements or pursuant to exemptions therefrom. This press release does not constitute an offer to sell or a solicitation to buy any securities in any jurisdiction. 

About Luca Mining Corp.  

Luca Mining Corp. (TSX-V: LUCA, OTCQX: LUCMF, Frankfurt: Z68) is a Canadian mining company with two wholly owned mines located in the prolific Sierra Madre mineralized belt in Mexico. These mines produce gold, copper, zinc, silver, and lead, generating strong cash flow. Both mines have considerable development and resource upside as well as significant exploration potential.  

The Company’s Campo Morado Mine hosts VMS-style, polymetallic mineralization within a large land package comprising 121 square kilometres. It is an underground operation, producing zinc, copper, gold, silver and lead. The mine is located in Guerrero State.  

The Tahuehueto Mine is a large property of over 100 square kilometres in Durango State. The project hosts epithermal gold and silver vein-style mineralization. Tahuehueto is a newly constructed underground mining operation producing primarily gold and silver. Luca has successfully commissioned its mill and is now in commercial production at Tahuehueto.   

On September 17, 2026, Luca announced that it entered into an agreement to acquire the El Barqueño Project, which is expected to close in Q4 2026, subject to receipt of regulatory approvals and customary closing conditions. The El Barqueño Project is a large-scale exploration and development property covering over 32,000 hectares in Jalisco State. Previously operated by Agnico Eagle, the El Barqueño Project is located approximately 100 kilometres west of Guadalajara and is accessible by paved and secondary roads. El Barqueño hosts a historical 2025 Mineral Resource estimate of 399,265 ounces of gold equivalent at 1.47 g/t AuEq in the Indicated category, with an additional 650,046 ounces at 1.43 g/t AuEq in the Inferred category. Following closing, Luca plans to advance permitting to enable exploration drilling and development studies.  

On September 21, 2026, Luca announced that it entered into an agreement with Capstone to acquire 100% of the Cozamin Mine in Zacatecas, Mexico for total upfront consideration of $290 million and up to an additional $95 million in deferred and contingent consideration. The Cozamin Mine is a long-standing, cash-generating underground copper-silver mine with 20 years of continuous production. Based on current consensus estimates, the Acquisition is expected to more than double Luca’s 2027 production profile, increase cash flow generation, and increase the Company’s exposure to copper and silver. The Acquisition also expands Luca’s operating footprint into Zacatecas, one of Mexico’s most productive mining regions.  

The Cozamin Mine has a long operating history and a historical mine plan supporting mine life through 2030, based on historical Mineral Reserve estimates disclosed by Capstone. Luca intends to undertake an extensive program of resource validation and exploration following closing, with the objective of extending mine life and demonstrating the long-term free cash flow generation potential of Cozamin. Luca has not adopted the historical mine plan and intends to develop an updated mine plan following completion of its review and verification of the historical technical information.  

Qualified Person 

The technical information contained in this news release has been reviewed and approved by Mr. Paul D. Gray, P.Geo., Vice President Exploration at Luca Mining.  Mr. Gray is a Qualified Person for the Company as defined by NI 43-101. 

Contact Information: 
Sophia Shane 
Director of Investor Relations 
sshane@lucamining.com +1 604 306 6867 
Maximilian Myers 
Manager of Corporate Development & Investor Relations 
ir@lucamining.com   

For more information, please visit: www.lucamining.com  

Cautionary Note Regarding Forward-Looking Statements 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward-Looking Information includes, but is not limited to: statements relating to the intended use of proceeds of the Offering and the Concurrent Private Placement; the ability of the Company to satisfy the Escrow Release Conditions; the receipt of final approval of the TSXV for the Offering and Concurrent Private Placement; statements relating to the proposed Acquisition; information as to the Company’s strategy, plans or future financial or operating performance; and other events or conditions that may occur in the future. These forward-looking statements and information reflect management’s current beliefs and are based on assumptions made by and information currently available to the Company with respect to the matters described in this news release. 

In certain cases, Forward-Looking Information can be identified using words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to: the ability of the Company to satisfy the Escrow Release Conditions by the Escrow Release Deadline; receipt of all required regulatory approvals; the successful completion of the Acquisition and the Company’s ability to achieve the anticipated benefits therefrom (including the acquisition of the El Barqueño project); the accuracy of historical and forward-looking operational information and estimates; the Company’s ability to successfully integrate the Cozamin Mine and the El Barqueño project into the Company’s existing operations; the ability of the Company to successfully obtain all exploration permits; the ability of the Company to complete the necessary work required with respect to the Cozamin Mine and the El Barqueño project and the anticipated benefits therefrom; the continuing accuracy of statements regarding the Cozamin Mine and the El Barqueño project, including the results of technical studies and the anticipated capital and operations costs, concession or claim renewal, permitting, mineral resource and/or reserve estimates, the cost of development, and other expected attributes of the properties, the timing of any environmental assessment processes, changes to configuration that may be requested as a result of stakeholder or government input to the environmental assessment processes, government regulations and permitting timelines; the future price of gold and other metals; currency exchange rates and interest rates; favourable operating conditions; political stability; timely receipt of governmental approvals, licenses, and permits (and renewals thereof); access to necessary financing; stability of labour markets and in market conditions in general; availability of equipment; the accuracy of mineral resource estimates, and of any metallurgical testing completed to date; the costs and expenditures to complete the Company’s programs and goals; the speculative nature of mineral exploration and development and mining operations in general; there being no significant disruptions affecting the development and operation of the Company’s properties; the availability of certain consumables and services and the prices for power and other key supplies being approximately consistent with assumptions; labour and materials costs being approximately consistent with assumptions; assumptions made in mineral resource estimates, including, but not limited to, geological interpretation, grades, metal price assumptions, metallurgical and mining recovery rates, geotechnical and hydrogeological assumptions, capital and operating cost estimates, and general marketing factors; requirements for additional capital; environmental risks; general business and economic conditions; delays in obtaining, or the inability to obtain, third-party contracts, equipment, supplies and governmental or other approvals; changes in law, including the enactment of mining law reforms; accidents; labour disputes; unavailability of appropriate land use permits; changes to land usage agreements and other risks of the mining industry generally; the inability to obtain financing required for the completion of exploration and development activities; changes in business and economic conditions; international conflicts; other factors beyond the Company’s control; and those factors included herein and elsewhere in the Company’s public disclosure. 

Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate as actual developments or events could cause results to differ materially from those anticipated. These include, among others, the factors described or referred to elsewhere herein and include unanticipated and/or unusual events. Many of such factors are beyond the Company’s ability to predict or control. 

The Forward-Looking Information included in this news release is expressly qualified by the foregoing cautionary statements. Readers of this news release are cautioned not to put undue reliance on the Forward-Looking Information due to its inherent uncertainty. The Company disclaims any intent or obligation to update any Forward-Looking Information, whether as a result of new information, future events or results or otherwise, unless required under applicable laws. This Forward-Looking Information should not be relied upon as representing management’s views as of any date subsequent to the date of this news release. 

Neither TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release. 

LUCA REPORTS Q3 2026 PRODUCTION RESULTS  

Luca Mining Corp. (“Luca” or the “Company”) (TSX-V: LUCA; OTCQX: LUCMF; Frankfurt: Z68) is pleased to report production results for the three months ended September 30, 2026. 

At Campo Morado, higher grades and improved metallurgical recoveries contributed to increased quarter-over-quarter production and sales of gold, silver and zinc. Higher grades reflected access to higher-grade stopes during the quarter, while improved recoveries were supported in part by the Company’s recently implemented stockpiling and mill feed blending strategy, alongside refinements to its reagent blend. Copper production and sales declined quarter-over-quarter due to lower copper feed grades. 

At Tahuehueto, temporarily reduced access to higher-grade stopes resulted in lower quarter-over-quarter feed grades across all metals. Although metallurgical recoveries improved modestly, these gains did not offset the impact of lower grades, resulting in reduced production and sales volumes during the quarter. 

As at September 30, 2026, Luca had a cash balance of approximately $19.1 million, compared to $24.7 million as at June 30, 2026. The decrease primarily reflected lower sales volumes, lower realized gold and silver prices, elevated costs related to corporate development activities, and continued investment in underground development, infrastructure and exploration across the Company’s operating assets. During the quarter, Luca also continued to strengthen its operational team in preparation for the anticipated acquisition of the Cozamin Mine, contributing to higher costs during the period. 

Payable Metal 
Mine Metal Three months ended  Sept 30, 2026 
Campo Morado Gold (oz) 1,163 
  Silver (oz) 186,777 
  Lead (k lbs) – 
  Zinc (k lbs) 6,551 
  Copper (k lbs) 1,468 
     
Tahuehueto Gold (oz) 3,140 
  Silver (oz) 61,588 
  Lead (k lbs) 530 
  Zinc (k lbs) 904 
  Copper (k lbs) 179 
     
Consolidated Gold (oz) 4,304 
  Silver (oz) 248,365 
  Lead (k lbs) 530 
  Zinc (k lbs) 7,455 
  Copper (k lbs) 1,648 
Produced Metal 
Mine Metal Three months ended Sept 30, 2026 
Campo Morado Gold (oz) 1,930 
  Silver (oz) 259,124 
  Lead (k lbs) 1,044 
  Zinc (k lbs) 8,685 
  Copper (k lbs) 1,947 
     
Tahuehueto Gold (oz) 3,420 
  Silver (oz) 74,919 
  Lead (k lbs) 921 
  Zinc (k lbs) 1,665 
  Copper (k lbs) 384 
     
Consolidated Gold (oz) 5,351 
  Silver (oz) 334,043 
  Lead (k lbs) 1,964 
  Zinc (k lbs) 10,350 
  Copper (k lbs) 2,332 

Exploration Update 

During the third quarter of 2026, the Company completed approximately 12,100 metres of drilling, bringing total drilling completed during the first nine months of 2026 to approximately 33,700 metres. Exploration activities remained focused on near-mine and resource expansion targets, with the objective of supporting future resource growth, extending mine life and improving production flexibility at the Company’s operating assets. 

CEO Commentary 

“While production at Tahuehueto was impacted by temporarily reduced access to higher-grade mining areas during the quarter, we were encouraged by the progress at Campo Morado, where higher grades and improved metallurgical recoveries contributed to stronger gold, silver and zinc production,” stated Dan Barnholden, Chief Executive Officer of Luca Mining. “We are beginning to see the benefits of our stockpiling and mill feed optimization strategy at Campo Morado, which is improving feed consistency and supporting better recoveries ahead of the anticipated improvements from the Campo Morado Expansion.” 

“At Tahuehueto, our focus remains on improving underground development and access to higher-grade mining areas, while continuing to advance operational efficiencies. Despite softer production and sales volumes during the quarter, we remain committed to investing in our operations and exploration programs to support longer-term growth.” 

“Beyond our existing operations, the recently announced agreements to acquire the Cozamin Mine from Capstone Copper and the El Barqueño Project from Agnico Eagle represent significant milestones in Luca’s growth strategy. These transactions have the potential to immediately increase our production and cash flow profile while adding substantial exploration and development opportunities to our portfolio. We are excited about the next chapter for Luca as we work toward completing these acquisitions and continue building a larger, more diversified polymetallic mining company in Mexico.” 

Non-GAAP Financial Measures 

Management believes that the reported non-GAAP financial measures will enable certain investors to better evaluate the Company’s performance, liquidity, and ability to generate cash flow. These measures do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate these measures differently. 

About Luca Mining Corp.  

Luca Mining Corp. (TSX-V: LUCA, OTCQX: LUCMF, Frankfurt: Z68) is a Canadian mining company with two wholly owned mines located in the prolific Sierra Madre mineralized belt in Mexico. These mines produce gold, copper, zinc, silver, and lead, generating strong cash flow. Both mines have considerable development and resource upside as well as significant exploration potential.  

The Company’s Campo Morado Mine hosts VMS-style, polymetallic mineralization within a large land package comprising 121 square kilometres. It is an underground operation, producing zinc, copper, gold, silver and lead. The mine is located in Guerrero State.  

The Tahuehueto Mine is a large property of over 100 square kilometres in Durango State. The project hosts epithermal gold and silver vein-style mineralization. Tahuehueto is a newly constructed underground mining operation producing primarily gold and silver. Luca has successfully commissioned its mill and is now in commercial production at Tahuehueto.   

On September 17, 2026, Luca announced that it entered into an agreement to acquire the El Barqueño Project, which is expected to close in Q4 2026, subject to receipt of regulatory approvals and customary closing conditions. The El Barqueño Project is a large-scale exploration and development property covering over 32,000 hectares in Jalisco State. Previously operated by Agnico Eagle, the El Barqueño Project is located approximately 100 kilometres west of Guadalajara and is accessible by paved and secondary roads. El Barqueño hosts a historical 2025 Mineral Resource estimate of 399,265 ounces of gold equivalent at 1.47 g/t AuEq in the Indicated category, with an additional 650,046 ounces at 1.43 g/t AuEq in the Inferred category. Following closing, Luca plans to advance permitting to enable exploration drilling and development studies.  

On September 21, 2026, Luca announced that it entered into an agreement with Capstone to acquire 100% of the Cozamin Mine in Zacatecas, Mexico for total upfront consideration of $290 million and up to an additional $95 million in deferred and contingent consideration. The Cozamin Mine is a long-standing, cash-generating underground copper-silver mine with 20 years of continuous production. Based on current consensus estimates, the Transaction is expected to more than double Luca’s 2027 production profile, increase cash flow generation, and increase the Company’s exposure to copper and silver. The Transaction also expands Luca’s operating footprint into Zacatecas, one of Mexico’s most productive mining regions.  

The Cozamin Mine has a long operating history and a historical mine plan supporting mine life through 2030, based on historical Mineral Reserve estimates disclosed by Capstone. Luca intends to undertake an extensive program of resource validation and exploration following closing, with the objective of extending mine life and demonstrating the long-term free cash flow generation potential of Cozamin. Luca has not adopted the historical mine plan and intends to develop an updated mine plan following completion of its review and verification of the historical technical information.  

Qualified Person 

The technical information contained in this news release has been reviewed and approved by Mr. Paul D. Gray, P.Geo., Vice President Exploration at Luca Mining.  Mr. Gray is a Qualified Person for the Company as defined by National Instrument 43-101. 

On Behalf of the Board of Directors 

(signed) “Dan Barnholden” 

Dan Barnholden, Chief Executive Officer 

Contact Information: 
Sophia Shane 
Director of Investor Relations 
sshane@lucamining.com  +1 604 306 6867 
Maximilian Myers 
Manager of Corporate Development & Investor Relations 
ir@lucamining.com   

For more information, please visit: www.lucamining.com  

Cautionary Note Regarding Forward-Looking Statements 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward-Looking Information includes, but is not limited to: statements relating to the intended use of proceeds of the Offering and the Concurrent Private Placement; the ability of the Company to satisfy the Escrow Release Conditions; the receipt of final approval of the TSXV for the Offering and Concurrent Private Placement; statements relating to the proposed Acquisition; information as to the Company’s strategy, plans or future financial or operating performance; and other events or conditions that may occur in the future. These forward-looking statements and information reflect management’s current beliefs and are based on assumptions made by and information currently available to the Company with respect to the matter described in this new release. 

In certain cases, Forward-Looking Information can be identified using words and phrases such as “plans”,” expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to: the ability of the Company to satisfy the Escrow Release Conditions by the Termination Date; receipt of all required regulatory approvals; the successful completion of the Acquisition and the Company’s ability to achieve the anticipated benefits therefrom (including the acquisition of the El Barqueño project); the accuracy of historical and forward-looking operational information and estimates; the Company’s ability to successfully integrate the Cozamin Mine and the El Barqueño project into the Company’s existing operations; the ability of the Company to successfully obtain all exploration permits; the ability of the Company to complete the necessary work required with respect to the Cozamin Mine and the El Barqueño project and the anticipated benefits therefrom; the continuing accuracy of statements regarding the Cozamin Mine and the El Barqueño project, including the results of technical studies and the anticipated capital and operations costs, concession or claim renewal, permitting, mineral resource and/or reserve estimates, the cost of development, and other expected attributes of the properties, the timing of any environmental assessment processes, changes to configuration that may be requested as a result of stakeholder or government input to the environmental assessment processes, government regulations and permitting timelines; the future price of gold and other metals; currency exchange rates and interest rates; favourable operating conditions; political stability; timely receipt of governmental approvals, licenses, and permits (and renewals thereof); access to necessary financing; stability of labour markets and in market conditions in general; availability of equipment; the accuracy of mineral resource estimates, and of any metallurgical testing completed to date; the costs and expenditures to complete the Company’s programs and goals; the speculative nature of mineral exploration and development and mining operations in general; there being no significant disruptions affecting the development and operation of the Company’s properties; the availability of certain consumables and services and the prices for power and other key supplies being approximately consistent with assumptions; labour and materials costs being approximately consistent with assumptions; assumptions made in mineral resource estimates, including, but not limited to, geological interpretation, grades, metal price assumptions, metallurgical and mining recovery rates, geotechnical and hydrogeological assumptions, capital and operating cost estimates, and general marketing factors; requirements for additional capital; environmental risks; general business and economic conditions; delays in obtaining, or the inability to obtain, third-party contracts, equipment, supplies and governmental or other approvals; changes in law, including the enactment of mining law reforms; accidents; labour disputes; unavailability of appropriate land use permits; changes to land usage agreements and other risks of the mining industry generally; the inability to obtain financing required for the completion of exploration and development activities; changes in business and economic conditions; international conflicts; other factors beyond the Company’s control; and those factors included herein and elsewhere in the Company’s public disclosure. 

Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate as actual developments or events could cause results to differ materially from those anticipated. These include, among others, the factors described or referred to elsewhere herein and include unanticipated and/or unusual events. Many of such factors are beyond the Company’s ability to predict or control. 

The Forward-Looking Information included in this news release is expressly qualified by the foregoing cautionary statements. Readers of this news release are cautioned not to put undue reliance on the Forward-Looking Information due to its inherent uncertainty. The Company disclaims any intent or obligation to update any Forward-Looking Information, whether as a result of new information, future events or results or otherwise, unless required under applicable laws. This Forward-Looking Information should not be relied upon as representing management’s views as of any date subsequent to the date of this news release. 

Neither TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.