Telson Provides Bi-Weekly Update on Management Cease Trade Order

Telson Mining Corporation (“Telson” or the “Company” (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) announces that further to its application for a Management Cease Trade Order (“MCTO”), which was granted by the British Columbia Securities Commission on June 16, 2020, the Company is required to provide bi-weekly status reports in accordance with the alternative information guidelines in National Policy 12-203 Management Cease Trade Orders (the “Guidelines”), until such time as the Company has completed and filed its audited annual financial statements and management’s discussion and analysis in respect of the financial year ended December 31, 2019 (the “Annual Filings”).

The Company reports that, since its June 12, 2020 default announcement in respect of the MCTO (the “Default Announcement”), there has not been any failure by the Company to fulfill its intentions with respect to satisfying the provisions of the Guidelines, and there have been no additional defaults subsequent to such announcement.

At this time, the Company does not expect that there will be a change to its anticipated timing of filing the Annual Filings on or before July 15, 2020.

The Company intends to follow the provisions of the Alternative Information Guidelines set out in NP 12-203, including the issuance of bi-weekly default status reports in the form of news releases, for as long as the Company remains in default. The Company confirms as of the date of this news release that there has been no material change in the information contained in the Default Announcement, and there is no other material information concerning the affairs of the Company that has not been generally disclosed. In addition, the Company hereby confirms that it has not received any financing from any related party at this time.

The Company continues to work diligently to prepare the Annual Filings and will continue to comply with the Guidelines until such deficiencies are remedied.

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver, and base metal mining projects. 

Telson’s Tahuehueto mining project, located in north-western Durango State, Mexico. Construction at Tahuehueto has been advanced to an estimated 60-70% of completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction during 2021, six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine with mining and milling equipment capable of producing up to 2,500 tonnes per day. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. .  Telson brought the mine out of care and maintenance and reinitiated mining and milling operations during late January 2020, temporarily suspended operations during April and May 2020 as mandated by the Mexican Government for COVID-19 precautions, and re-initiated Mining operations June 4, 2020 after mining was declared an essential service within Mexico .

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson’s production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment (“PEA”) mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018). 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; the ability to recommence outstanding payments to Nyrstar;  and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; that discussions with Nyrstar and the abeyance of any potential default proceedings will be completed in a timely manner and on reasonable terms, the continuity of the price of gold and other metals, economic and political conditions and operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Telson & Nyrstar Canada Execute Conditional Waiver Removing Loan from Default Status

Telson Mining Corporation (“Telson” or the “Company” (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) is pleased to announce that it has entered into a letter agreement (the “Nyrstar Letter Agreement”) with Nyrstar Canada (Holdings) Ltd., (“Nyrstar”) in which Nyrstar has provided Telson a conditional waiver to Telson’s default status of the June 12, 2018 Loan Agreement, entered into between the companies, as amended (the “Nyrstar Loan Agreement”).

In a press release dated April 17, 2020, Telson announced that it had entered into a waiver request letter agreement with Trafigura Mexico SA de CV, (the “Trafigura Letter Agreement”) where Telson agreed to transfer all its assets in the Campo Morado project and its assets in the Tahuehueto project to the trustee of the Trust Agreement (the “Trust”) so as to secure all of its Trafigura loan obligation and Trafigura waived past and forgoing defaults under Trafigura’s loan agreement with Telson, deferring interest and principal payments until June 30, 2021.  This Trust is in the process of being established.

Under the terms of the Nyrstar Letter Agreement, Telson acknowledges that it is in default of its obligations under the Nyrstar Loan Agreement and as an inducement for Nyrstar to enter into the Nyrstar Letter Agreement granting the waivers, Telson, with Trafigura consent, has agreed to accept Nyrstar into the Trust thereby granting full security to Nyrstar subordinate to Trafigura and new secured lender(s) that may provide debt funding that fund the final Tahuehueto mine construction costs.

The Nyrstar Letter Agreement further provides,

  • Nyrstar’s conditional approval and consent to allow Telson to avoid a cause for default by granting Telson a waiver, forgoing defaults under the Nyrstar Loan Agreement, and deferring interests and principal payments until June 30, 2021.
  • This waiver eliminates the Nyrstar Loan Agreements restriction on Telson for disposition of assets, if necessary, to generate cash to allow Telson to repay its loan obligations to Nyrstar.
  • Nyrstar agrees to restructure Telson’s entire loan debt obligation under terms and conditions to be negotiated on good faith by both parties based on market conditions and updated cash flow projections which confirm either of Telson’s projects financial viability if,
  1. the Tahuehueto Project is ramped up or,
  2. the Campo Morado project successfully operates and shows monthly repayment of due obligations to Nyrstar and Trafigura on at least 6 consecutive months in amounts not less to an aggregate of $300,000 per month, on a pro rata basis based on outstanding amounts due under the Loan Agreement with Nyrstar and the Campo Morado Loan Agreement with Trafigura.
  3. If Telson successfully raises funding in a sufficient amount to fully fund the final construction and ramp up of the Tahuehueto Project, which funding amount and requirements for effective ramp up to be independently verified by a mutually acceptable independent engineering consultant.

If Telson repays the total debt due to Nyrstar under the Nyrstar Loan Agreement, Nyrstar shall no longer be a beneficiary of the Trust.

“Telson Management is very pleased to have successfully negotiated and executed both the Nyrstar Letter Agreement and the Trafigura Letter Agreement to bring the Company out of its respective loan default status and conditionally defer interest and principle payments to June 30, 2021.” states Mr. Ralph Shearing, President and CEO of the Company, “With Telson’s June 16, 2020 news release disclosing the execution of the US$12 million Medium Term Loan Facility with Accendo Banco all efforts are being made to  assist Accendo’s due diligence to allow this loan to close and restart construction at our Tahuehueto Gold Mine while we continue to operate the Campo Morado Mine in as efficient manner as possible to maximize its revenue.”

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver and base metal mining projects. 

Telson’s Tahuehueto mining project, located in north-western Durango State, Mexico. Construction at Tahuehueto has been advanced to an estimated 60-70% of completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction during 2021, six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine with mining and milling equipment capable of producing up to 2,500 tonnes per day. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. .  Telson brought the mine out of care and maintenance and reinitiated mining and milling operations during late January 2020, temporarily suspended operations during April and May 2020 as mandated by the Mexican Government for COVID-19 precautions, and re-initiated Mining operations June 4, 2020 after mining was declared an essential service within Mexico .

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson’s production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment (“PEA”) mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018). 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; the ability to recommence outstanding payments to Nyrstar;  and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; that discussions with Nyrstar and the abeyance of any potential default proceedings will be completed in a timely manner and on reasonable terms, the continuity of the price of gold and other metals, economic and political conditions and operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Telson Forms Strategic Funding Alliance with Accendo Banco for US$12 Million

Telson Mining Corporation (“Telson” or the “Company” (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) announces that it has signed an updated term sheet with Accendo Banco, S.A. Insititucion de Banca Multiple (“Accendo”) whereby Accendo will, subject to final due diligence, provide Telson with a US$12 Million Medium Term Loan Facility (“MTLF”) for the purpose of funding construction at Telson’s Tahuehueto mining project and general working capital purposes.

The main terms and conditions of Accendo’s MTLF are as follows:

  • Loan facility amount – US$ 12 Million
  • Repayment term – 3 years with a one-year grace period on principal
  • Repayable in 24 equal monthly payments starting 12 months after closing
  • Interest rate of 13.5% per annum
  • Secured by second ranking security interest over all assets of the Company
  • An arrangement fee of 2.5% of the facility amount payable from the proceeds upon first draw down at the closing
  • An origination fee of 2.5% of the facility amount payable from the proceeds upon first draw down at the closing
  • Telson to issue, subject to TSX Venture Exchange approval, 15 Million bonus warrants at an exercise price of $0.09/share for a period of 48 months. The bonus warrants are to be issued in lieu of a work fee but subject to cancelation if the loan facility does not close
  • The loan facility is subject to final due diligence of Accendo

In addition to the MTLF, Accendo will provide Telson further financial support as follows:

  1. Accendo intends to purchase up to US$500,000 (approximately Cdn$678,800) of Telson’s critical existing debt with Tahuehueto mining project’s suppliers (arm’s length) and has agreed to convert the debt into common shares of Telson based on a coverage ratio on the debt amount settled. The parties have agreed that the shares to be issued will be based on 1.2x coverage ratio to the nominal debt amount purchased by Accendo and shares will be issued at the last closing price of the Company shares as quoted on the TSX Venture Exchange on June 15, 2020.
  • Accendo has introduced investors willing to participate in an equity investment in Telson of up to $750,000. Accordingly, the Company intends to conduct a non-brokered private placement (the “Private Placement”) of up to 7,500,000 units (the “Units”) at a price of $0.10 per Unit for total proceeds of up to $750,000. Each Unit will consist of one common share of the Company and one half of a transferable share purchase warrant (each whole warrant being a “Warrant” of the Company). Each whole Warrant will entitle the holder to acquire one additional common share of the Company for a period of two years at an exercise price of $0.15 per share. The proceeds from the Offering are expected to be used to continue advancing the construction of Tahuehueto project and general working capital.

All the above transactions are subject to TSX Venture Exchange approval.

Mr. Ralph Shearing, Telson’s CEO and President states “ Telson’s management is extremely pleased to have gained the major financial support of Accendo Banco and upon closing of the US$12 Million loan facility, the Company will be in a position to advance its 100% owned Tahuehueto gold mine towards the completion of construction which we strive to achieve in early 2021.

“On behalf of Accendo Banco we are very excited to become involved with Telson Mining Corporation as one of their main financial backers and intend to move rapidly to complete final due diligence in order to close Telson’s funding within the next 1 to 2 months” stated Javier Reyes de la Campa, CEO of Accendo “our technical mining team have come to know the Tahuehueto Gold Project well and Accendo is convinced that it is one of Mexico’s premier advanced gold mines under development and will soon reach production with our bank financial assistance.  We are committed to help Telson reach production at Tahuehueto and intend to use our financial knowledge and network within the Mexican mining industry to assist with additional funding, if required.”

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver and base metal mining projects. 

Telson’s Tahuehueto mining project, located in north-western Durango State, Mexico where construction has been advanced to approximately 70% completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine that produces zinc, lead, copper, silver, and gold. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. Telson brought the mine out of care and maintenance, reinitiating mining and milling operations late January 2020, operating through February and March however, temporarily suspended operations at the beginning of April as mandated by the Mexican Government Ministry of Health which proclaimed a national health emergency suspending all “non-essential” public and private sector business, including mining as a result of the COVID-19 pandemic. The Company re-started operations on June 3, 2020 after the Mexican government recognized mining as essential to the economy and are allowing companies to initiate mining activities.

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson’s production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment (“PEA”) mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018). 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; the continuity of the price of gold and other metals, economic and political conditions and operations and that the Filings will be completed in the time period anticipated. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Telson Updates Delay in Filing Annual Financial Statements and Management’s Discussion and Analysis

Telson Mining Corporation (“Telson” or the “Company” (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) provides the following mandatory regulatory update that it has requested a temporary Management Cease Trade Order (“MCTO”) from the British Columbia Securities Commission (“BCSC”) in connection with the Company’s filing of its audited annual financial statements (the “Audited Financial Statements”) and MD&A for the financial year ended December 31, 2019.

On March 23, 2020, the Canadian Securities Administrators granted blanket relief (the “Blanket Relief”) for all reporting issuers, providing up to a 45-day extension for periodic filings normally required to be made on or before June 1, 2020. Due to the circumstances created by the COVID-19 pandemic, the Company issued a news release on April 27, 2020,  relying on the extension provided for under the Blanket Relief, announcing the delay of filing of its Audited Financial Statements, the annual MD&A and the applicable CEO and CFO certifications (the “Annual Filings”), as the Company did not believe that it would be able to file the Annual Filings by its usual 120-day deadline of April 29, 2020 as required pursuant to National Instrument 51-102 Continuous Disclosure Obligations (“NI 51-102”). At that time, the Company expected to complete the Filings to be completed on or before June 16, 2020.

The Company is requesting the MCTO in order to secure additional time to finalize the Annual Financial Statements. As a result of the recent COVID-19 pandemic and the unexpected delays connected therewith, the Company anticipates a longer than anticipated timeframe for the audit of the Annual Financial Statements. However, it is the Company’s reasonable expectation that the Annual Filings will be finalized by July 15, 2020. 

By way of background and as required by the BCSC, the Company notes the following:

  1. The Company is required to file its Annual Filings all in accordance with IFRS, by June 16, 2020 (the “Annual Filing Deadline”), being the extended filing deadline in accordance with the Blanket Relief. The Company does not anticipate that it will be able to complete the Annual Filings on or before the Filing Deadline.
  2. The Company and its auditors are working diligently to prepare and file the Annual Filings, on or before July 15, 2020.
  3. The Company confirms that it intends to issue a status report on a bi-weekly basis, for as long as it remains in default of the Annual Filing Deadline in respect of the Annual Filings.
  4. There is no other material information concerning the affairs of the Company that has not been generally disclosed.

The Company has imposed an insider trading blackout pending the filing of the Annual Filings and will comply with the alternative information guidelines described in National Policy 12-203 Management Cease Trade Orders during such period.

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver and base metal mining projects. 

Telson’s Tahuehueto mining project, located in north-western Durango State, Mexico where construction has been advanced to approximately 70% completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine that produces zinc, lead, copper, silver and gold. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance. Telson brought the mine out of care and maintenance, reinitiating mining and milling operations late January 2020, operating through February and March however, temporarily suspended operations at the beginning of April as mandated by the Mexican Government Ministry of Health which proclaimed a national health emergency suspending all “non-essential” public and private sector business, including mining as a result of the COVID-19 pandemic. The Company re-started operations on June 3, 2020 after the Mexican government recognized mining as essential to the economy and are allowing companies to initiate mining activities.

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson’s production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment (“PEA”) mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018). 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; the continuity of the price of gold and other metals, economic and political conditions and operations and that the Filings will be completed in the time period anticipated. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071

Telson Resumes Operations at Campo Morado Mine in Mexico

Telson Mining Corporation (“Telson” or the “Company” (TSX Venture Exchange-TSN, OTC Pink-SOHFF, Frankfurt-TSGN (formerly SQ82)) is pleased to announce that mining and milling operations have resumed at Campo Morado mine in Guerrero, Mexico. The Mexican Government recently deemed the mining industry to be an essential industry, resulting in lifting of the temporary country wide mining industry shut down because of the COVID-19 pandemic.

Detailed COVID-19 safety protocols approved by the Instituto Mexicano del Seguro Social (“IMSS”) have been implemented at the Campo Morado mine site to protect the health and safety of all our employees. These protocols include strict sanitary measures, return-to-work health screenings and on-site medical personnel to monitor and respond to any health concerns.

Underground mining and processing activities re-commenced on June 3, 2020.  Prior to the temporary suspension of activities this last April, the mine was operating at an average production rate between 1,900 to 2,200 tons per day. Additionally, the Company has about 2,900 tonnes of zinc concentrate, and 650 tonnes of lead concentrate currently stored at the mine site and available for immediate shipping. The Company already started its shipping procedures to deliver its concentrates to the point of sale at the port of Manzanillo.

“As a result of the Covid-19 pandemic, the past months have been very difficult for our organization and in general for everyone all over the world.” States Ralph Shearing, CEO and President of Telson, “thankfully, there has been no COVID-19 reported infection to any of our Campo Morado employees or anyone at Telson. Additionally, with the strict health protocols recently developed and implemented at Campo Morado mine site and throughout our organization, we are confident that we will be able to maintain continuous mining operations at Campo Morado while minimizing the risk and exposure to COVID-19 virus”  

About Telson Mining Corporation

Telson Mining Corporation is a Canadian based mining company with two 100% owned Mexican gold, silver and base metal mining projects. 

Telson’s Tahuehueto mining project, located in north-western Durango State, Mexico where construction has been advanced to approximately 70% completion and waiting for final funding to finish construction of the processing plant and related assets to produce gold, silver, lead and zinc in concentrates within its own on-site mineral processing facility, with a designed capacity of at least 1,000 tonnes per day. The Company is targeting completion of construction during 2021, six to eight months after securing final funding.

Campo Morado is a polymetallic base metal mine with mining and milling equipment capable of producing up to 2,500 tonnes per day. Four months after purchasing Campo Morado, Telson brought the mine back into operation initiating preproduction in October 2017 and declared commercial production in May 2018, operating the mine continuously for 22 months until August 2019 when the project was put on care and maintenance as a result of declining zinc prices and community issues.  Telson brought the mine out of care and maintenance and reinitiated mining and milling operations during late January 2020, temporarily suspending operation during April and May 2020 as mandated by the Mexican Government for COVID-19 pandemic precautionary measures and reinitiated mining operation during the first week of June 2020.

Visit: www.telsonmining.com

On Behalf of the Board of Directors

(signed) “Ralph Shearing”

Ralph Shearing, President, CEO and Director

Cautionary Note Regarding Production Decisions and Forward-Looking Statements

It should be noted that Telson declared commercial production at Campo Morado prior to completing a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, readers should be cautioned that Telson’s production decision has been made without a comprehensive feasibility study of established reserves such that there is greater risk and uncertainty as to future economic results from the Campo Morado mine and a higher technical risk of failure than would be the case if a feasibility study was completed and relied upon to make a production decision. Telson has completed a preliminary economic assessment (“PEA”) mining study on the Campo Morado mine that provides a conceptual life of mine plan and a preliminary economic analysis based on the previously identified mineral resources (see News Release dated November 8, 2017 and April 4,2018). 

Statements contained in this news release that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities laws. Forward Looking Information includes, but is not limited to, disclosure regarding the planned recommencement of mining operations at Campo Morado; the ability to recommence outstanding payments to Nyrstar;  and other possible events, conditions or financial performance that are based on assumptions about future economic conditions and courses of action; the timing and costs of future activities on the Company’s properties, such as production rates and increases; success of exploration, development and bulk sample processing activities, and timing for processing at its own mineral processing facility on the Tahuehueto project site. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as “plans”, “expects”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or variations of such words and phrases. In preparing the Forward-Looking Information in this news release, the Company has applied several material assumptions, including, but not limited to, that the current exploration, development, environmental and other objectives concerning the Campo Morado Mine and the Tahuehueto Project can be achieved; that recommencement of operations at Campo Morado will proceed as planned; that discussions with Nyrstar and the abeyance of any potential default proceedings will be completed in a timely manner and on reasonable terms, the continuity of the price of gold and other metals, economic and political conditions and operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about Telson Mining Corporation, please contact:

Glen Sandwell
Corporate Communications Manager
ir@telsonmining.com
Tel: +1 (604) 684-8071